Skip to content
CareRulebook
MenuClose

What do you run?

Home care in the US19 states with a manual, 6 with a free guide
ColoradoManual
ConnecticutPack
DelawareManual
GeorgiaManual
IllinoisManual
IndianaManual
KansasManual
MaineManual
MarylandManual
MinnesotaManual
NevadaManual
North CarolinaManual
OklahomaManual
OregonManual
South CarolinaManual
TennesseeManual
TexasManual
VirginiaManual
WashingtonManual
CaliforniaGuideFloridaGuideNew JerseyGuideNew YorkGuideOhioGuidePennsylvaniaGuideAll US home care states →
Care homes in the USCalifornia, Michigan, Minnesota; more states coming
Home care in the UKEngland, Scotland, Wales
Free toolsChecklists, calculators and templates

Michigan · AFC license fees and time limits · MCL 400.713a

Michigan adult foster care license: cost and timeline

LARA charges $150 for a small group home license for 3 to 6 adults, $100 for a family home, $200 for 7 to 12 and $500 for a large group home, the same fee at each 2-year renewal. The Act gives LARA 6 months from a completed application to decide. Here are the state’s fees, other costs with official sources, fire safety and zoning for 7 or more, each step to the license, what stops the clock and the deadlines the law fixes.

  • Rule-verified November 13, 2026
  • Quoted from MCL 400.713 and 400.713a
  • Every fee linked to its source
A woman in a mustard sweater at an oak dining table in a Michigan house ticks off a printed checklist beside an open teal CareRulebook binder with yellow tabs, a sticky note reading Program statement, a mug of tea and a highlighter, with a snowy backyard through the window

Quick answer

Cost: LARA’s fee for a temporary or renewal license is $150 for a small group home of 3 to 6, $100 for a family home, $200 for 7 to 12 and $500 for a large group home (MCL 400.713a(3)(b)). LARA says "Fees are non-transferable." (LARA)

Time: "The department shall issue an initial or renewal license not later than 6 months after the applicant files a completed application." (MCL 400.713(14)) The clock stops while LARA waits for missing information or a corrective action plan. We found no published average processing time. Your first license is temporary, for 6 months (MCL 400.714(1)).

$150

LARA’s fee for a small group home of 3 to 6 (a state fee, not a CareRulebook price)

MCL 400.713a(3)(b)

$100

LARA’s fee for a family home

MCL 400.713a(3)(b)

6 months

LARA’s time limit from a completed application

MCL 400.713(14)

2 years

How long a regular license lasts

MCL 400.719(2)

What LARA charges

Each amount below is set in the AFC Act, MCL 400.713a(3)(b), from January 1, 2022, and paid to LARA with the application. The same fee applies to the temporary license and to each 2-year renewal. None of them is a CareRulebook price. LARA no longer issues new congregate licenses except to replace an existing facility (MCL 400.715), so the congregate fee is not shown.

LARA’s adult foster care license fees (state fees)
Home typeState feeNotesSource
Family home (3 to 6, licensee lives there)$100Temporary or renewal license.MCL 400.713a(3)(b)(i)
Small group home, 3 to 6$150Temporary or renewal license.MCL 400.713a(3)(b)(ii)
Small group home, 7 to 12$200Temporary or renewal license. Bureau of Fire Services approval needed too.MCL 400.713a(3)(b)(iii)
Large group home, 13 to 20$500Temporary or renewal license. Bureau of Fire Services approval needed too.MCL 400.713a(3)(b)(iv)
  • How to pay. Family and group home applications are made online through MiLogin, with the fee paid by card. (LARA) A family home applicant without a card can use LARA’s paper application, BCAL-1047 (LARA).
  • Fees do not move. Once you submit, adding or removing a licensee name or changing the facility type needs a new application: "These changes require the submission of a new application and a new fee." and "Fees are non-transferable." (LARA group home page). LARA strongly recommends calling its Licensing Unit on 1-866-685-0006 before you apply (LARA).
  • If LARA is late. "If the department fails to issue or deny a license within the time required by this section, the department shall return the license fee and shall reduce the license fee for the applicant's next renewal application, if any, by 15%." (MCL 400.713(16))
  • A pending bill. Would create an Adult Foster Care Facility Licenses Fund and let LARA raise license fees each year by up to the average civil service pay increase. It is not law; when we checked on November 13, 2026, the fee section of the Act was unchanged (SB 567).

Working out your state fees

Simple arithmetic, not a state figure

Growing from 6 to 7 or more. Going above 6 in a small group home needs a new temporary license application (MCL 400.719(4)), so a new state fee of $200 for 7 to 12, on top of the $150 you paid for 3 to 6, by our reading of the fee schedule (MCL 400.713a(3)(b)).

Simple arithmetic, not a state figure

If LARA misses its time limit. For a small group home of 3 to 6: the $150 fee back, then a next renewal fee of $150 × 0.85 = $127.50 (MCL 400.713(16)).

Other costs of getting and keeping the license

Each card says where the duty comes from. We give a price only where an official source sets one, and say so where we found none.

Your fingerprint check

The applicant (if an individual), the licensee designee and owners, partners or directors with regular direct access or on-site responsibilities give fingerprints for state and FBI checks. The State Police may charge the person checked a fee of no more than the actual and reasonable cost; the Act sets no amount, and we found none in LARA’s pages.

MCL 400.713(21)-(22)Licensee and owner checks →

Staff criminal history checks

Since July 1, 2020, any State Police or FBI fee for the check is paid by the home, the staffing agency or the individual. The Act sets no amount.

MCL 400.734b(4)How staff checks work →

Health and fire inspections

LARA’s application tutorial says it requests the environmental health and sanitation inspections and the fire safety inspections it needs at no charge to the applicant. A home not on a community water system also sends a coliform, nitrate and arsenic water test report with the initial application and each renewal; the rule sets no price for the test. For homes of 7 or more, the Bureau of Fire Services plan review has its own costs (see the next card).

LARA tutorialR 400.645(2)

Bureau of Fire Services (7 or more)

LARA sends applicants for 7 or more a Fire Safety Inspection Request (BCAL-1712) and an Application for Fire Safety Plan Examination (BFS-979), which go to BFS attached to sealed and signed architectural plans. For homes of 7 or more, certified firms send BFS shop drawings for the hood suppression, fire alarm and sprinkler systems; each approved plan review report (a "12A") goes back signed with a $40 processing fee to BFS (a Bureau of Fire Services fee). We found no price for the plans themselves or the fire safety work.

LARA fire safety pageFire safety and zoning →

Medical clearances

A physician’s Medical Clearance Request for each applicant and responsible person, and physician’s health statements for staff and household members. We found no price set by LARA.

LARA group home pageR 400.631(2)

Penalties (not fees)

LARA first notifies an unlicensed operator that it must be licensed; a person who does not apply within 30 days is subject to the penalty: a misdemeanor, up to 2 years in prison or a fine of up to $50,000, or both. A further violation after a conviction is a felony (up to 5 years or $75,000).

MCL 400.713(12)-(13)

Fees are set by the State of Michigan and the Bureau of Fire Services, not by CareRulebook. We did not price building work, insurance, sprinklers or alarm systems.

CareRulebook

The policies LARA expects before it recommends a license, written for your home

Answer a few questions and CareRulebook writes your Michigan adult foster care policy and procedure manual: every row of LARA’s required policies checklist answered, with the standard or routine procedures and the emergency and fire safety plans, your home’s details and the rule quoted under each policy. Read every policy before you adopt it.

  • 41 policies and documents, 102 requirements mapped
  • A LARA checklist index with the pages in your manual for each row
  • Editable Word and PDF; download again free for 12 months
Preview your manual

$299CareRulebook founding price for the first 50 Michigan homes, then $349. Not a LARA fee; the state’s license fee is separate.

Fire safety and zoning for homes of 7 or more

Size changes both the timeline and the cost. For 6 or fewer, LARA staff inspect fire safety; for more than 6, the Bureau of Fire Services does (MCL 400.711(3)).

  • Bureau of Fire Services approval first. "The department shall not issue a temporary, provisional, or regular license to an adult foster care facility with a capacity of more than 6 adults until the facility receives a certificate of approval from the bureau of fire services" (MCL 400.720(1)) LARA sends applicants for 7 or more a Fire Safety Inspection Request (BCAL-1712) and an Application for Fire Safety Plan Examination (BFS-979), which go to BFS attached to sealed and signed architectural plans. (LARA fire safety page)
  • Shop drawings and the $40 fee. For homes of 7 or more, certified firms send BFS shop drawings for the hood suppression, fire alarm and sprinkler systems; each approved plan review report (a "12A") goes back signed with a $40 processing fee to BFS (a Bureau of Fire Services fee). (LARA fire safety page)
  • Every year after. "Following original license issuance, annual inspections are conducted by BFS thereafter." (LARA) The Bureau’s own rules, R 400.18101 to R 400.18702, apply to every AFC home licensed for 7 or more (R 400.18101(1)).
  • Zoning. "A temporary license shall not be granted under this act if the proposed adult foster care facility for more than 6 adults has not obtained zoning approval or obtained a special or conditional use permit if required by an ordinance of the city, village, or township in which the proposed facility is located." (MCL 400.716(2)) LARA’s application tutorial says: "A proposed facility for 7 or more should first obtain written local zoning approval. The application process cannot proceed without this approval." (LARA tutorial)
  • Concentration. For any size, unless the city, village or township approves, "a temporary license shall not be granted under this act if the issuance of the license would substantially contribute to an excessive concentration of community residential facilities within a city, village, or township of this state." (MCL 400.716(1))
  • Local rules aimed at AFC homes. The Act supersedes local regulations that apply specifically to AFC homes, and local rules for institutions do not apply to family, small group or large group homes; local construction codes for private residences still apply. (MCL 400.733)

How long it takes, step by step

The order follows LARA’s application pages and the Act. Only steps with a fixed time show one. Tick steps off as you go; progress is saved in this browser only. For a list tailored to your home, use the free Michigan AFC license checklist.

  1. Take LARA’s pre-licensing course and read the rules

    Before applying

    LARA points prospective applicants to its Adult Foster Care Pre-Licensing Training Course and tells them to read the rules and the Act before applying.

  2. Zoning first, for 7 or more

    Before applying (7 or more)

    A temporary license for more than 6 adults needs local zoning approval or a permit where the ordinance requires one. LARA’s application tutorial says the application cannot proceed without written zoning approval. Fire safety and zoning.

    MCL 400.716(2)
  3. Write your policies and procedures

    Before LARA’s recommendation (start early)

    LARA’s leaflet says they must be complete before it recommends a license. This is the step most in your control. What each must say.

  4. Apply online and pay LARA’s fee

    Day 0

    Through MiLogin, by card. $100 to $500 depending on the home type (state fees). The fees.

    MCL 400.713a(3)(b); LARA
  5. Mail the clearance forms together

    With the application

    Fingerprint clearance for the applicant or licensee designee, information requests for the administrator and adult household members, and a physician’s medical clearance. LARA does not process the application until these are in.

    LARA group home page
  6. Incomplete? LARA tells you within 30 days

    Within 30 days

    LARA describes what is missing within 30 days of receiving an incomplete application. The 6-month clock stops until you send it.

    MCL 400.713(14)
  7. A licensing consultant is assigned

    After processing

    After the application, fee and record clearances are processed, the application goes to a field office and a consultant contacts you. Floor plans go to the consultant before any new construction.

    LARA group home page
  8. Fire, health and on-site inspections

    During review

    LARA staff inspect fire safety for 6 or fewer; the Bureau of Fire Services approves homes for 7 or more. The local health authority inspects a private well or septic system. The consultant makes the on-site evaluation. What LARA checks.

  9. Local clerk notified

    At least 45 days before the license

    LARA notifies the city, village or township clerk at least 45 days before it issues a license for a proposed home.

    MCL 400.732(1)
  10. Temporary license for 6 months

    Within 6 months of a completed application

    The first license is temporary, for the first 6 months of operation. LARA’s application tutorial says residents may not be admitted before the license is issued. The licensee and administrator complete LARA’s free AFC New Provider Training within 6 months.

  11. Regular license for 2 years

    From month 6

    At the end of the first 6 months, LARA issues a regular or provisional license, or refuses. A regular license is valid for 2 years and is renewed with the same state fee.

The 6-month clock

  • When it starts. From a completed application: an application complete on its face, with every question answered and requested item provided, the license fee, and any approval the law requires from a local unit of government, a federal agency or a private entity. A local health department inspection is not part of it. (MCL 400.713(27))
  • When it stops. While LARA waits for information it asked for, or until it finds a corrective action plan has been met (MCL 400.713(14)). Before a temporary license, LARA may require an acceptable plan of correction, carried out within the temporary license period (MCL 400.714(2)).
  • No published average. We found no average processing time on LARA’s pages. LARA’s director reports to the legislature by December 1 each year on the previous fiscal year’s applications, including how many were completed within 6 months and the average processing time for licenses granted after the 6 months. (MCL 400.713(18)) We have not seen a recent report.

What can stall it

Clearance forms missing

Applications will not be processed until this information has been received and the Clearance Request conducted.

LARA group home page

Changing the application after you submit

A changed licensee name or facility type needs a new application and a new fee, and the old fee is not credited. Call the Licensing Unit first.

LARA group home page

Zoning or fire approval not in place

For more than 6 adults, no temporary license without zoning approval where required, and no license of any kind without the Bureau of Fire Services certificate of approval.

MCL 400.716(2); 400.720(1)

Construction before plans are approved

Once a consultant is assigned, applicants must submit floor plans for approval before new construction starts.

LARA group home page

Policies not finished

LARA’s leaflet lists the required policies and procedures among the things that must be complete before a recommendation for licensure, and its tutorial says the initial inspection report for a group home may list missing required policy and procedure documents.

LARA FAQ leaflet (archived March 2025)LARA tutorial

Late or incomplete documents

LARA’s October 2026 technical assistance manual says the Division may weigh an applicant’s ability to submit complete, acceptable documentation on time, and may refuse an original license where a documented pattern of missing or noncompliant submissions shows a lack of administrative capability.

LARA technical assistance manual

A medical clearance dated too early

It cannot be dated more than 6 months before the license is issued, so LARA suggests waiting until you have spoken to a consultant.

LARA group home page

The deadlines the law and LARA fix

These periods are set by the AFC Act, the rules or LARA’s pages. Some are LARA’s to meet, most are yours.

Deadlines for Michigan adult foster care homes, with who meets each and the source
WhatWhenWhoSource
LARA’s notice that an application is incompleteWithin 30 days of receiving itLARAMCL 400.713(14)
Initial or renewal licenseWithin 6 months of a completed application, with the clock stopped while LARA waits for information or a corrective action planLARAMCL 400.713(14)
Notice to the local clerkAt least 45 days before a license for a proposed homeLARAMCL 400.732(1)
Medical clearance for the applicant and responsible personDated no more than 6 months before the license is issuedYouLARA group home page
State and FBI results for a staff checkWithin 30 days of the request, from the State Police to LARAState PoliceMCL 400.734b(5)
Temporary licenseThe first 6 months of operation; not renewableLARAMCL 400.714(1)
AFC New Provider TrainingWithin 6 months of the first license or of being hiredLicensee and administratorR 400.627(2)
Health statements for staff and household membersWithin 30 days of starting or moving inYouR 400.631(2)
Written notice of a change to application informationWithin 10 business daysYouR 400.611(4)
Notice that a volunteer or household member is on probation or parole or has a felonyWithin 48 hours of becoming awareYouR 400.623(9)
Regular licenseValid for 2 yearsLARAMCL 400.719(2)
Renewal inspectionAny time in the 12 months before the license expiresLARAMCL 400.713(3)
Provisional license6 months; renewable up to 2 times in a row for physical plant deficiencies onlyLARAMCL 400.717
Incident report LARA asks forSent electronically within 24 hours of the requestYouR 400.693(4)

Renewal every 2 years

  • The term. "A regular license for all adult foster care facilities except adult foster care camps is valid for 2 years after the date of issuance" (MCL 400.719(2)) The renewal fee is the same as the temporary license fee for your home type (MCL 400.713a(3)(b)).
  • The renewal inspection. "On-site inspections conducted for renewing a license may be conducted within 12 months before the expiration date of the current license without impact on the license renewal date or the license fee." (MCL 400.713(3)) What a renewal inspection covers.
  • No new fingerprints if continuous. A licensee or designee who was checked and has stayed continuously licensed or employed is "that person is not required to submit to another criminal history check or criminal records check upon renewal of the license" (MCL 400.713(23)).
  • Private water. A home not on a community water system sends the water test report with every renewal application (R 400.645(2)).

Buying a licensed home

  • A new license, and a new fee. "A license shall be issued to a specific person for a facility at a specific location and is nontransferable." (MCL 400.713(7)) The buyer applies for a license, with the state fee for the home type.
  • The seller tells LARA first. A licensee selling a home gives LARA advance written notice, and the parties meet LARA before the sale to learn which items of noncompliance the new owner must correct before getting a license. (MCL 400.713(8))
  • Zoning. The zoning and concentration limits on temporary licenses do not apply to an applicant who bought a home that was licensed at the time of purchase or in the year before the application. (MCL 400.716(4)) Fire safety approval for 7 or more still applies to any license (MCL 400.720(1)).

Myths about cost and timing

Can I just add a seventh bed to my small group home?

No. Going above 6 in a small group home needs a new temporary license application, and homes for more than 6 need Bureau of Fire Services approval and local zoning approval where the local ordinance requires it.

"Any increase beyond 6 in the number of persons to be received for foster care at 1 time in a small group home requires application for a temporary license pursuant to sections 14 and 16."

Frequently asked questions

How much does an adult foster care license cost in Michigan?

LARA’s fee for a temporary or renewal license is $100 for a family home, $150 for a small group home of 3 to 6, $200 for 7 to 12 and $500 for a large group home. These are the State of Michigan’s fees, set by the AFC Act from January 1, 2022, not CareRulebook prices. LARA’s application tutorial says the environmental health and fire safety inspections it requests are at no charge to the applicant.

How long does it take to get an AFC license in Michigan?

The Act gives LARA 6 months from a completed application to issue or deny a license, with the clock stopped while LARA waits for missing information or a corrective action plan, and LARA refunds the fee if it is late. We found no published average time. Homes for 7 or more also wait for zoning and Bureau of Fire Services approval, and LARA notifies the local clerk at least 45 days before issuing.

Is the AFC license fee refundable?

LARA says fees are non-transferable: if you need a new application, for example to change a licensee name or the facility type after submitting, the earlier fee is not credited to it. The one refund the Act sets is when LARA misses its time limit: it returns the license fee and cuts your next renewal fee by 15%.

Can I take residents before the license arrives?

No. LARA’s application tutorial says residents may not be admitted before the license is issued. Operating without a license is a misdemeanor once LARA has told you to apply and you have not applied within 30 days.

What does it cost to go from 6 to 7 or more residents?

Going above 6 in a small group home needs a new temporary license application (MCL 400.719(4)), so by our reading a new state fee of $200 for 7 to 12; ask LARA’s Licensing Unit to confirm. You also need Bureau of Fire Services approval and local zoning approval where the ordinance requires it. The Bureau of Fire Services side includes sealed architectural plans and, for each certified firm’s approved plan review report, a $40 processing fee to the Bureau.

Is there a pending fee increase?

Senate Bill 567 of 2025: AFC license fund and fee increases. Would create an Adult Foster Care Facility Licenses Fund and let LARA raise license fees each year by up to the average civil service pay increase. It is a bill, not law, and the fee section of the Act was unchanged when we checked on November 13, 2026.

Get Michigan AFC rule-change alerts

Michigan’s AFC fees are set in the Act, and a pending bill would let LARA raise them each year. Leave your email and we will tell you when a fee or rule change affects your home.

No spam. Only emails about Michigan adult foster care rules. How we use your email.

Keep reading

Sources

  1. Adult Foster Care Facility Licensing Act, 1979 PA 218, MCL 400.701 to 400.737 (Michigan Compiled Laws, complete through PA 114 of 2026) · Michigan Legislature · retrieved November 13, 2026
  2. Licensing Adult Foster Care Facilities, Mich. Admin. Code R 400.601 to R 400.745 (2025 AACS) · Michigan Office of Administrative Hearings and Rules (Administrative Code, for LARA Bureau of Community and Health Systems) · retrieved November 13, 2026
  3. Adult Foster Care Facilities fire safety rules, R 400.18101 to R 400.18702 (homes for 7 or more) · LARA Bureau of Fire Services (Michigan Administrative Code) · retrieved November 13, 2026
  4. Adult Foster Care Administrative Licensing Rules Technical Assistance Manual, revised October 7, 2026 · LARA Bureau of Community and Health Systems, Adult Foster Care Division · retrieved November 13, 2026
  5. LARA AFC web pages: AFC home, applicants, licensees (example policies and templates), trainings, license application packet, group home and family home application instructions, rules and statutes, resident forms (Internet Archive copies, 2026) · LARA Bureau of Community and Health Systems · retrieved November 13, 2026
  6. Adult Foster Care Division FAQ leaflet for applicants (Internet Archive copy, March 23, 2025) · LARA Bureau of Community and Health Systems, Adult Foster Care Division · retrieved November 13, 2026
  7. Senate Bill 567 of 2025 (adult foster care license fees): bill page, introduced text and Senate Fiscal Agency analysis · Michigan Legislature; Senate Fiscal Agency · retrieved November 13, 2026

Free sample, no email needed

Read a full policy before you buy

Policy 6.1, Emergency preparedness policy and plan, as it prints in the Michigan adult foster care manual, filled in for a fictional home. The rule text it rests on is quoted word for word under Rule basis.

PDF · 14 pages · 151 KB · Rule-verified November 13, 2026

Collecting answers for a home or a client? The intake questionnaire lists all 100 questions the builder asks, what each decision changes in the manual, and a completed example: Word · PDF.How consultants use CareRulebook.

Download the sample (PDF)
Or email it to me

We send the link once. Nothing else unless you tick the box. Privacy notice.

Build your Michigan AFC manualfrom $299